← The Pullman Wire
Infrastructure

Cable Installation Work Begins in Pomeroy

πŸ”Š Listen Β· narrated by Aiden

WSDOT began cable installation work in Pomeroy on Monday, September 20, 2026, with alternating-flagged controlled traffic between 6th Street and South 7th Street. The work will continue Monday through Friday from 8 a.m. to 4 p.m. until October 1, 2026.

Residents in Pomeroy should expect traffic delays during the specified hours. The work is part of a utility installation project and is scheduled to end on October 1, 2026, at 4 p.m.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts4 of 4 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    Cable Installation Work Begins in Pomeroyβ€œ012 [27 mi from Pullman]: Both directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation.”
  • βœ“
    WSDOT starts cable installation with traffic control on Pomeroy streets Monday through Friday, 8 a.m. to 4 p.m., through Oct. 1.β€œBoth directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation.”
  • βœ“
    WSDOT began cable installation work in Pomeroy on Monday, September 20, 2026, with alternating-flagged controlled traffic between 6th Street and South 7th Street. The work will continue Monday through Friday from 8 a.m. to 4 p.m. until October 1, 2026.β€œ012 [27 mi from Pullman]: Both directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation. Effective: Sep 20, 2026, 11:38 PM Expected end: Oct 1, 2026, 4:00 PM”
  • βœ“
    Residents in Pomeroy should expect traffic delays during the specified hours. The work is part of a utility installation project and is scheduled to end on October 1, 2026, at 4 p.m.β€œBoth directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation.”
Source text saved for this check (2026-09-21T07:02:38.465Z)
WSDOT highway construction and road closures within 50 miles of Pullman β€” 9/21/2026:

012 [27 mi from Pullman]: Both directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation.
Effective: Sep 20, 2026, 11:38 PM
Expected end: Oct 1, 2026, 4:00 PM

The Pullman Wire is free. Get Pullman's news delivered every morning.