← The Pullman Wire
Infrastructure

Pomeroy Road Closure for Cable Work

πŸ”Š Listen Β· narrated by Aiden

Both directions between 6th street and south 7th street in Pomeroy will have alternating-flagged controlled traffic for cable installation. The closure is scheduled Monday through Friday from 8 a.m. to 4 p.m. daily, effective Sep 20, 2026, and expected to end Oct 1, 2026, at 4 p.m.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    Pomeroy Road Closure for Cable Workβ€œ012 [27 mi from Pullman]: Both directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation.”
  • βœ“
    Cable installation causes 8 a.m. to 4 p.m. closures on Pomeroy streets Monday-Friday starting Sep 20.β€œBoth directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation.”
  • βœ“
    Both directions between 6th street and south 7th street in Pomeroy will have alternating-flagged controlled traffic for cable installation. The closure is scheduled Monday through Friday from 8 a.m. to 4 p.m. daily, effective Sep 20, 2026, and expected to end Oct 1, 2026, at 4 p.m.β€œBoth directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation.”
Source text saved for this check (2026-09-23T06:59:05.216Z)
WSDOT highway construction and road closures within 50 miles of Pullman β€” 9/22/2026:

012 [27 mi from Pullman]: Both directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation.
Effective: Sep 20, 2026, 11:38 PM
Expected end: Oct 1, 2026, 4:00 PM

The Pullman Wire is free. Get Pullman's news delivered every morning.