← The Pullman Wire
Infrastructure

Pomeroy Road Work Begins Sept 20

πŸ”Š Listen Β· narrated by Aiden

WSDOT announced both directions of road work will occur between 6th Street and South 7th Street in Pomeroy starting Sept 20 at 11:38 PM. The work will last until Oct 1 at 4:00 PM, with alternating-flagged traffic control Monday through Friday from 8 a.m. to 4 p.m.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    Pomeroy Road Work Begins Sept 20β€œEffective: Sep 20, 2026, 11:38 PM Expected end: Oct 1, 2026, 4:00 PM”
  • βœ“
    Cable installation work in Pomeroy will cause alternating traffic control weekdays 8 a.m. to 4 p.m. through Oct 1.β€œBoth directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation.”
  • βœ“
    WSDOT announced both directions of road work will occur between 6th Street and South 7th Street in Pomeroy starting Sept 20 at 11:38 PM. The work will last until Oct 1 at 4:00 PM, with alternating-flagged traffic control Monday through Friday from 8 a.m. to 4 p.m.β€œ012 [27 mi from Pullman]: Both directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation. Effective: Sep 20, 2026, 11:38 PM Expected end: Oct 1, 2026, 4:00 PM”
Source text saved for this check (2026-09-29T19:02:39.429Z)
WSDOT highway construction and road closures within 50 miles of Pullman β€” 9/29/2026:

012 [27 mi from Pullman]: Both directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation.
Effective: Sep 20, 2026, 11:38 PM
Expected end: Oct 1, 2026, 4:00 PM

The Pullman Wire is free. Get Pullman's news delivered every morning.