← The Pullman Wire
Public Safety

Pullman Roadwork Affects Traffic This Week

πŸ”Š Listen Β· narrated by Aiden

WSDOT announced multiple roadwork projects affecting Pullman-area highways this week. Traffic shifts and lane closures will occur on SR 532, SR 522, SR 96, I-90, SR 526, SR 211, SR 155, and SR 432 from July 31 through August 7, 2026.

SR 211 will have both directions closed from milepost 2 to US-2 from 6:30 a.m. to 9 p.m. on July 31 with 20-minute delays expected. SR 96 will alternate traffic with flaggers daily from 7 a.m. to 2 p.m. through July 31. SR 532 will shift westbound traffic between mileposts 3 and 4 from 9 p.m. Sunday, August 2 to 4 a.m. Monday, August 3. I-90 will close two lanes in both directions from 8 p.m. Tuesday, August 4 to 3 a.m. Wednesday, August 5.

The roadwork is for maintenance and utility projects. WSDOT advises drivers to expect delays and use caution. The SR 155 closure due to a wildfire remains in effect with no reopening date determined.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Checked against the public record8 of 10 claims Β· 80%

Every factual claim below was checked against the original public record. Source: original document β†—

  • ⚠
    WSDOT announced multiple roadwork projects affecting Pullman-area highways this week.β€œnull”
  • ⚠
    Traffic shifts and lane closures will occur on SR 532, SR 522, SR 96, I-90, SR 526, SR 211, SR 155, and SR 432 from July 31 through August 7, 2026.Not found in the source record β€” unverified.
  • βœ“
    SR 211 will have both directions closed from milepost 2 to US-2 from 6:30 a.m. to 9 p.m. on July 31.β€œ211: Lane Closure on SR 211 both directions from milepost 2 to US-2. Beginning at 6:30 am until 9:00 pm on July 31, 2026. Flaggers and a pilot car are in place. Expect delays of about a 20 minuets. Effective: Jul 31, 2026, 6:29 AM Expected end: Jul 31, 2026, 9:00 PM”
  • βœ“
    20-minute delays are expected on SR 211 on July 31.β€œ211: Lane Closure on SR 211 both directions from milepost 2 to US-2. Beginning at 6:30 am until 9:00 pm on July 31, 2026. Flaggers and a pilot car are in place. Expect delays of about a 20 minuets.”
  • βœ“
    SR 96 will alternate traffic with flaggers daily from 7 a.m. to 2 p.m. through July 31.β€œ096: Daily from 7 a.m. to 2 p.m. beginning Monday, July 27 to 2 p.m. Friday, July 31, State Route 96 traffic will alternate with flaggers from East Lowell Larimer Road (milepost 4) to State Route 9 (milepost 6) for utilities work.”
  • βœ“
    SR 532 will shift westbound traffic between mileposts 3 and 4 from 9 p.m. Sunday, August 2 to 4 a.m. Monday, August 3.β€œ532: From 9 p.m. Sunday, Aug. 2 to 4 a.m. Monday, Aug. 3, the westbound traffic on SR 532/Camano Island Highway between 102nd Avenue Northwest (milepost 4) and 104th Drive Northwest (milepost 3) will see a traffic shift for maintenance paving.”
  • βœ“
    I-90 will close two lanes in both directions from 8 p.m. Tuesday, August 4 to 3 a.m. Wednesday, August 5.β€œ090: From 8 p.m. Tuesday, Aug. 4 to 3 a.m. Wednesday, Aug. 5, two lanes of Interstate 90 will close in both directions between Eighth Avenue South (milepost 2) and the floating bridge (milepost 4) for maintenance.”
  • βœ“
    The roadwork is for maintenance and utility projects.β€œ532: From 9 p.m. Sunday, Aug. 2 to 4 a.m. Monday, Aug. 3, the westbound traffic on SR 532/Camano Island Highway between 102nd Avenue Northwest (milepost 4) and 104th Drive Northwest (milepost 3) will see a traffic shift for maintenance paving.”
  • βœ“
    WSDOT advises drivers to expect delays and use caution.β€œFlaggers and a pilot car are in place. Expect delays of about a 20 minuets.”
  • βœ“
    The SR 155 closure due to a wildfire remains in effect with no reopening date determined.β€œ155: SR 155 is closed from milepost 46, two miles north of Nespelem to milepost 78, one mile east of Omak, due to a wildfire. An estimated reopening time is not determined.”

The Pullman Wire is free. Get Pullman's news delivered every morning.