← The Pullman Wire
Public Safety

Pullman Roadwork Scheduled for Late July and Early August

πŸ”Š Listen Β· narrated by Aiden

WSDOT announced several road closures and lane reductions for Pullman, WA, effective late July through early August 2026. The most significant changes include a northbound SR 522 lane closure from 8 p.m. Aug. 5 to 3 a.m. Aug. 6, and a two-lane closure on I-90 from 8 p.m. Aug. 4 to 3 a.m. Aug. 5. SR 211 will have lane closures both directions from 6:30 a.m. to 9 p.m. July 31, with expected 20-minute delays. Other closures include SR 526, US 2, and SR 20 work beginning Aug. 3 through Aug. 7. WSDOT states these closures are for maintenance and utility work, with flaggers and pilot cars in place for some projects. Drivers should expect delays during these periods.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Checked against the public record6 of 16 claims Β· 38%

Every factual claim below was checked against the original public record. Source: original document β†—

  • ⚠
    WSDOT announced several road closures and lane reductions for Pullman, WAβ€œnull”
  • ⚠
    The road closures and lane reductions are effective late July through early August 2026Not found in the source record β€” unverified.
  • ⚠
    The most significant changes include a northbound SR 522 lane closureβ€œnull”
  • βœ“
    The northbound SR 522 lane closure is from 8 p.m. Aug. 5 to 3 a.m. Aug. 6β€œ522: From 8 p.m. Wednesday, Aug. 5 to 3 a.m. Thursday, Aug. 6, the right lane of northbound State Route 522 from State Route 202/132nd Avenue to the State Route 9 overpass (milepost 12-13) will close for maintenance.”
  • ⚠
    There is a two-lane closure on I-90β€œnull”
  • βœ“
    The two-lane closure on I-90 is from 8 p.m. Aug. 4 to 3 a.m. Aug. 5β€œ090: From 8 p.m. Tuesday, Aug. 4 to 3 a.m. Wednesday, Aug. 5, two lanes of Interstate 90 will close in both directions between Eighth Avenue South (milepost 2) and the floating bridge (milepost 4) for maintenance.”
  • βœ“
    SR 211 will have lane closures both directionsβ€œ211: Lane Closure on SR 211 both directions from milepost 2 to US-2. Beginning at 6:30 am until 9:00 pm on July 31, 2026. Flaggers and a pilot car are in place. Expect delays of about a 20 minuets.”
  • βœ“
    The SR 211 lane closures both directions are from 6:30 a.m. to 9 p.m. July 31β€œ211: Lane Closure on SR 211 both directions from milepost 2 to US-2. Beginning at 6:30 am until 9:00 pm on July 31, 2026. Flaggers and a pilot car are in place. Expect delays of about a 20 minuets. Effective: Jul 31, 2026, 6:29 AM Expected end: Jul 31, 2026, 9:00 PM”
  • βœ“
    The SR 211 lane closures both directions are expected to have 20-minute delaysβ€œFlaggers and a pilot car are in place. Expect delays of about a 20 minuets.”
  • ⚠
    Other closures include SR 526β€œnull”
  • ⚠
    Other closures include US 2β€œnull”
  • ⚠
    Other closures include SR 20β€œnull”
  • ⚠
    The work on SR 526, US 2, and SR 20 begins Aug. 3 through Aug. 7β€œnull”
  • ⚠
    WSDOT states these closures are for maintenance and utility workNot found in the source record β€” unverified.
  • βœ“
    Flaggers and pilot cars are in place for some projectsβ€œFlaggers and a pilot car are in place.”
  • ⚠
    Drivers should expect delays during these periodsβ€œnull”

The Pullman Wire is free. Get Pullman's news delivered every morning.