Both directions of SR 129 will be closed Tuesday, October 20 from 6 p.m. to 10 p.m. for the installation of new signals.
Detours are available via local routes for the closure on SR 129 between Clarkston and Asotin at milepost 38.
Both directions of SR 129 will be closed Tuesday, October 20 from 6 p.m. to 10 p.m. for the installation of new signals.
Detours are available via local routes for the closure on SR 129 between Clarkston and Asotin at milepost 38.
Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the modelβs assessment; readers can inspect the quote. Source: original document β
WSDOT highway construction and road closures within 50 miles of Pullman β 10/18/2026: 129 [26 mi from Pullman]: Both directions SR 129 (milepost 38) between Clarkston and Asotin will be closed Tuesday, October 20 from 6 p.m. to 10 p.m. for the installation of new signals. Detours are available via local routes. Effective: Oct 18, 2026, 6:28 AM Expected end: Oct 20, 2026, 10:00 PM
The Pullman Wire is free. Get Pullman's news delivered every morning.