← The Pullman Wire
Infrastructure

US 12 over I-5 to close nightly for repairs

πŸ”Š Listen Β· narrated by Aiden

US 12 over I-5 will close nightly from 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20 for bridge repairs, according to WSDOT. The closure affects milepost 66.5 and will require drivers to follow a detour using northbound I-5 to Exit 71 for SR 508, then southbound back to US 12.

Travelers should expect delays during the closure period, with flaggers directing traffic to the detour. The work is part of bridge maintenance and is scheduled to end by Aug. 20, 6 a.m., when normal traffic flow will resume.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts5 of 10 claims supported Β· 50%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    US 12 over I-5 will close nightly from 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20β€œFrom 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20: A single lane of US 12 over I-5 (milepost 66.5) will close nightly for bridge repairs.”
  • ⚠
    The closure is for bridge repairs according to WSDOTNo usable supporting receipt β€” unverified.
  • ⚠
    The closure affects milepost 66.5No usable supporting receipt β€” unverified.
  • βœ“
    Drivers will follow a detour using northbound I-5 to Exit 71 for SR 508β€œFlaggers will direct travelers to a signed detour using northbound I-5 to Exit 71 for SR 508, then southbound back to US 12.”
  • βœ“
    Drivers will follow a detour using southbound I-5 back to US 12β€œFlaggers will direct travelers to a signed detour using northbound I-5 to Exit 71 for SR 508, then southbound back to US 12.”
  • βœ“
    Travelers should expect delays during the closure periodβ€œSlow down, stay focused and expect delays.”
  • βœ“
    Flaggers will direct traffic to the detourβ€œFlaggers will direct travelers to a signed detour using northbound I-5 to Exit 71 for SR 508, then southbound back to US 12.”
  • ⚠
    The work is part of bridge maintenanceNo usable supporting receipt β€” unverified.
  • ⚠
    The work is scheduled to end by Aug. 20, 6 a.m.No usable supporting receipt β€” unverified.
  • ⚠
    Normal traffic flow will resume by Aug. 20, 6 a.m.No usable supporting receipt β€” unverified.

The Pullman Wire is free. Get Pullman's news delivered every morning.